Property Description

Standing tall above the Seawoods railways station is the sprawling Seawods Grand Central, Navi Mumbai. Spread over: 1.6 Million Sq.Ft.

Strategically located on Delhi Mumbai industrial corridor and the Bengaluru Mumbai industrial corridor. It is also in the proximity of India’s largest port JNPT and to the proposed International Airport and the Tarns Harbour link.

Location Advantage

Railway Station- Seawoods Darave: 0 KM
This railway station on the Harbour line in the Nerul node. located adjacent to Sector 40 & 42. Station is directly connected to Seawoods Grand Central.

The station has a total of 4 platforms. Platform no. 01 and 02 has trains for going to Mumbai, Thane and Panvel and platform no. 03 & 04 connects to Ulwe and the upcoming Navi Mumbai International Airport.

10 lane sion panvel highway :3 KM
Sion Panvel Expressway is a 25 km. connects Sion in Mumbai with Panvel, via Navi Mumbai, also connect Mumbai with the city of Pune.10 lanes (5 lanes in each direction)

Belapur CBD: 4.5 KM

Proposed International Airport: 9.8 KM
It is to be located on National Highway 4B near Panvel, about 35 km (22 mi) from the existing Chhatrapati Shivaji International Airport.New Mumbai international airpot is an under construction at Ulwe Kopar-Panvel . It is the second international airport for the Mumbai Metropolitan Region, functioning alongside Chhatrapati Shivaji Maharaj International Airport . The first phase of the airport will be able to handle 10 million passengers per annum. The airport will be expanded to full capacity and will be equipped to handle more than 60 million passengers per annum. Project is executed by GVK group & City and Industrial Development Corporation. The airport covers an area of 1,160 hectares.

Mumbai Pune Express Highway: 13.8 KM

Proposed Trans Harbour Link :16 KM
Also called as Sewri-Nhava Sheva Trans Harbour Link, is an under-construction 21.8 km, freeway grade road bridge connecting Mumbai with Navi Mumbai. Proposed longest sea bridge in India.

The road will be linked to the Mumbai Pune Expressway in the east, and to the proposed Western Freeway in the west. The sea link will contain a 6-lane highway, which will be 27 meters in width. Construction began in April 2018 and schedule to complete in 5 year (2022).

JNPT: 20 KM

Close to – NH 3 (Uttar Pradesh, Rajasthan, Madhya Pradesh and Maharashtra), NH 4, & NH 17

Near proposed Navi Mumbai metro corridor

Metro is planned to consist of five lines, totalling 106.4 kilometres. Work started in 2017 for Line 1 of the metro which is under construction, completion is expected April 2020.It consist of 2 station Belapur, Kharghar, Taloje, MIDC, Kalamboli and the Khandeshwar railway station and further to new international airport.

Line 2- MIDC Taloja-Kalamboli–Khandeshwar (extension to Airport proposed)

Line 3- Interlink between Pendhar and MIDC

BKC: 27 KM
Hinjewadi: 122 KM
Features:

Triple height Entrance lobby
Centrally air-conditioned building
Large Column- free space
Dedicated office drop points
3-level basement for car parking
Ho-speed elevators
Hi tech security system
Integrated BMS- Building management system
Amenities:

Green pre-certified project (Leed gold rating)
Direct State grid power supply
Advance firefighting system
The project offers office space starting from 1700 Sq.ft. to 90,000 Sq.ft. on a single floor.

Few of L&T Seawoods’ major tenants:

Teva & Watson Pharma – 1.33 Lacs Sq Ft (Rental 95 psf)

SBI Life Insurance – 1 Lacs Sq Ft (Purchased)

Koch Chemicals – 35000 Sq Ft(Purchased)

Fleet Management/Caravel Group – 50000 Sq Ft

E Tap Automation – 10000 Sq Ft

Ansell India Private Limited- 5000 Sq Ft

Bernhard Schulte Shipmanagement- 9000 Sq Ft(R

ental 92 psf)

Class NK – 7500 Sq Ft(Rental 98 psf)

Transworld Group of Companies- 41000(Purchased)

Details

Property Views

    Leave a Reply

    Your email address will not be published.*